Pre-Shipment Inspection: What to Check Before a Machine Leaves
The expensive failures in this trade do not happen in the factory. They happen in the four weeks between crating and commissioning, when a missing part, a wrong voltage or a braced door nobody documented turns into a stopped installation on the other side of the world.
This is the list we would use if we were the buyer. It assumes the commercial questions — price, warranty, terms — are already settled, and it is only about the machine in front of you.
Eight checks, in the order they matter
If you cannot travel
Most buyers do not fly out for a machine. That is fine, but it changes what the evidence has to be. Three things substitute for being there, in descending order of usefulness:
- Your parts, blasted by them — the strongest evidence, because it tests the machine against your actual job rather than against a demonstration piece.
- An unedited video of the loaded run — a single continuous take, with the machine serial number visible at the start and the finish at the end. Edited clips prove nothing.
- A third-party inspector — worth it on a large line, and worth specifying who pays for the re-inspection if the item fails.
The documents that prevent arguments later
A machine arrives with a crate and a folder. The folder is what you will be reading at 2 a.m. during commissioning, so check it before the crate is closed:
On the voltage point there is a longer note worth reading before you approve the panel: how a machine is configured for a specific grid.
- Test report with the actual readings, not a blank template
- Wiring diagram matching the panel as built
- Manual with maintenance intervals and torque values
- Packing list that matches the photographs you took
- The contact of the engineer who will answer questions, not a general sales address
What "acceptance" should mean
Acceptance is not the moment the machine is paid for. It should be the moment a defined sample reaches a defined grade at a defined rate — and it is worth writing that sentence into the order rather than assuming it.
If the sample is blasted at the factory, keep it. A physical reference part settles more arguments than any certificate, because both sides can put it next to the disputed batch and look.
Questions buyers ask
Related: how a machine is checked before it leaves, delivery, warranty and payment questions, the seven checks before you choose a supplier.
Want to witness the run?
Send your sample parts ahead and come for the loaded test — or ask for the unedited video with the serial number in frame.
Arrange an inspection